Construction

Five questions at the tailgate. A briefing the crew actually signs.

Briefwright turns a five-question morning briefing into a site-specific safety briefing — hazards and controls tuned to the crew, the equipment, the location, the weather, and the workers working adjacent. Built for construction toolbox talks and site-specific safety meetings, not the day on the calendar.

Sample brief — construction shift meeting

What a Briefwright construction toolbox talk looks like.

Three hazards a construction shift meeting typically covers — working at height, energized lines, and heavy equipment. Each row is the brief the supervisor reads at the tailgate, then has the crew sign against.

Working at height
Hazard 01 · today

Hazards

  • Tier-2 deck pour at gridline C, slab edge opens onto the stair well
  • Wind gusts lifting on the south face — gusts to 25 mph forecast before 11:00
  • Leading-edge work 18 ft up; a new apprentice on the line today

Controls

  • 100% tie-off inside 6 ft of any edge; dedicated spotter on the deck below
  • Pause aerial lifts when sustained gusts exceed 20 mph — supervisor calls it
  • Two-minute fall-restraint review with the apprentice before the deck is set

PPE

  • Hard hat (chin strap on at height)
  • Full-body harness with shock-pack lanyard
  • Cut-A gloves, steel-toe boots
Energized lines
Hazard 02 · today

Hazards

  • 12.5 kV overhead run along the north property line — within reach of the long-reach boom
  • Site power upgraded last night; lockout points moved to the new panel
  • Excavator swing radius crosses the utility corridor on the east cut

Controls

  • Spotter stays within arm’s length of any boom extension under the line
  • Re-locate to the new panel before lifting — supervisor signs off the lockout
  • Mark a 10 ft clearance radius with cones and paint; no sweep into the corridor

PPE

  • Class-2 insulated gloves (rated to 17 kV)
  • Arc-rated long-sleeve shirt — CAT 2 minimum
  • Voltage-rated boots, no exposed metal snaps
Heavy equipment
Hazard 03 · today

Hazards

  • Two excavators and one articulated hauler running on shared haul roads
  • New haul route today — gravel, not the usual pit run
  • Backing blind-spot continues to be the most reported near-miss on this site

Controls

  • Banksman assigned to every backing maneuver — radio check before each move
  • Spotters at both intersections; one radio, one hand signal backup
  • Walk the haul road at start of shift and again after each rain

PPE

  • Hi-viz Class-2 vest with reflective tape (worn on the outer layer)
  • Hearing protection in the equipment envelope (NRR ≥ 25)
  • Hard hat with chin strap on for every haul road crossing

The full Briefwright brief adds emergency procedures, communications, and exclusion zones on top of hazards / controls / PPE — and it’s tuned to the day’s crew, equipment, location and weather from the five-question briefing.

The Briefwright library

A briefing library shaped around the work.

Browse the safety briefings Briefwright prepares for this industry and the work crews do inside it.

Loading the construction briefing library…

Join the construction crew waitlist

Pilot Briefwright on one construction shift.

Drop your work email and we’ll show you the meeting Briefwright would write for a real construction day — hazards, controls, exclusion zones, PPE, emergency procedures — before you pick a plan.

We’ll reach out when a pilot slot opens on your fit plan.